Photographs are of a completed home — finishes will vary with your builder.
Narrow lots are no problem for this classic coastal design. Double master suites and a total of five bedrooms and five and one half baths. Vaulted ceilings on the third floor.
Coastal lots often require a local structural engineer to review and seal plans before permitting. We’ll point you in the right direction — read about engineering.
Send your questions and we’ll get back promptly.
Requests for rear elevations may take 24 hours.
To inquire about the cost to modify a house plan, please fill out the form below. The designer or architect will review your changes for feasibility and will then provide pricing/timeframe for your project. The typical turnaround for this request is between 1 to 2 business days.